📞 Call (480) 400-0140

Pool Remodel Projects in Gilbert and the East Valley

Real pool remodel projects by Blue Lagoon, with before and after photos from Gilbert and Tempe.

Blue Lagoon Pool Management trusted local pool service badge
Request Free Estimate!
Blue Lagoon Pool Management trusted local pool service badge
Name
Address

Pool Remodels We Have Finished in the East Valley

Every photo on this page is from a pool our crew worked on. We have serviced East Valley pools for 16 years, and we have remodeled them for six.

Each job is listed by city, never by address. More pool remodel projects will go up here as we finish them.

New waterline tile and coping on a remodeled pool in Tempe, AZ

Ready to start your own pool remodel? Get a free estimate from Blue Lagoon Pool Management

How a Remodel With Blue Lagoon Works

You get one project manager from the first walk to the final walkthrough.

Free On-Site Estimate
Pick Your Colors and Finishes
Enjoy Your New Pool
Why Choose Us

Why Homeowners Choose Blue Lagoon for Pool Remodel Projects

We have serviced East Valley pools for 16 years and remodeled them for six. One project manager runs your job from the estimate to the final walkthrough.

16 Years in Business

Blue Lagoon has cared for East Valley pools since 2010 and has remodeled them for the past six years.

Certified PebbleTec Installer

We are an authorized PebbleTec installer. We also install StoneScapes and Universal White Cement pebble.

Licensed, Bonded and Insured

Arizona ROC 347885 (KA-5) and ROC 297987 (CR-6). Voted Best of Gilbert and Best of Chandler.

Written Warranty

2 years on workmanship, 10 years on pebble finishes and 2 years on decking.

Pool Resurfacing Before and After

Here is the same pool before and after a new interior. First the old finish was chipped out, and then the crew shot the new one. See how it works on our pool resurfacing page.

Drained pool before and after pool resurfacing by Blue Lagoon

Waterline Tile Before and After

Loose waterline tile is one of the first things homeowners notice. On this job the failing tile came off, and new tile went on along the coping. Prices are on our pool tile and coping page.

Pool waterline tile before and after, with loose tiles replaced along the coping

Pebble Finish Remodel in Gilbert

This Gilbert remodel has a new pebble interior and tiled bar stools in the water. Pebble is the finish we install most, because it lasts 15 to 18 years with balanced water. Read more on Pebble Tec finishes.

Remodeled pool with a pebble finish and tiled bar stools in Gilbert, AZ

Finished Pool Remodel in Tempe

This is a finished remodel in Tempe, filled and running. After the fill, our own techs add the startup chemicals and program the equipment. Then we do a final walkthrough with the homeowner.

Finished pool remodel in Tempe, AZ, filled and running

Chip-Out Day on a Pool Remodel

Every remodel starts rough. First our techs drain the pool, and then the demo crew chips out the old interior. This pool is shown mid chip-out, before the new finish went on.

Crew chipping out the old interior during a pool remodel

Pool Deck Tear-Out on a Full Remodel

On a full remodel, the old deck sometimes has to come out. Here it is torn out, so the new surface can go down. See your options on pool deck resurfacing.

Old pool deck torn out during a full pool remodel

Worn Waterline Tile Before a Remodel

This is what tile looks like when it is due. The tile is the same age as the interior finish, so the two usually wear out together. That is why we suggest replacing both at once.

Worn, failing waterline tile on an older pool before a remodel in Tempe, AZ

Start Your Own Pool Remodel Project

Most full remodels run $25,000 to $38,000 and take two to four weeks. A pool-only remodel is usually $12,000 to $15,000. Tell us what you have in mind, and we will come out, measure and email you an estimate.

Blue Lagoon is a licensed contractor (ROC 347885 and ROC 297987), which you can verify on the Arizona Registrar of Contractors site. Start with our pool remodeling page, or request a free estimate.

Pool Remodel Financing Options

You can apply for pool remodel financing through either of these companies:

Lyon Financial 

HFS Financial

Pool Remodel Project Questions, Answered

These are the questions homeowners ask us most. If yours is not here, reach out and we will answer it.

Yes. Every photo here is from a pool our crew worked on.

The projects on this page are in Gilbert and Tempe. We remodel pools across the greater Phoenix area and the East Valley.

A full remodel takes two to four weeks. Weather can change the schedule, though.

$25,000 to $38,000 for a full remodel. A pool-only remodel usually runs $12,000 to $15,000.

Yes. We bring pebble, tile and decking samples to your home, so you can match a look you like.

In the busy season we are booked about two weeks out.

Still have questions?